To,
Riaz Ahmad Khan, Technical Advisor, GM
(C&M) water WAPDA,Wapda House Lahore
Subject. Articles written by Mr Fateh ullah Khan
Gandapur
Reference Secretary
Water and Power letter NoW1-4(20)/2011 dated May, 2012
My views after two meetings on 18 water issues (copies of
issues sent to all) were discussed hastily and superficially in about 4 to 5
hours in two sittings. Each issue in consequences is as serious as the floods
of 2010 and the ongoing crippling load shedding. The committee discussed some
issues swiftly, where WAPDA representative was arguing as an advocate to defend
the crimes of his client. This is not the way to decide the fate of each burning
issue costing billions of dollars, involving the economy, the food needs, and
existence of the country, and the well fair of the people.
All the 18 Water issues are very serious. The severe load
shedding is about to create bloody revolution. WAPDA is responsible for the
devastation of floods of 2010, the current power shortage, the water shortage, and
the rapid silting of Terbela Reservoir. for not allowing the building of Basha
Dam whose feasibility was established in 1981. WAPDA stuck to its ego for building
Kalabagh Dam with tailored TOR for
building the Left bank canal with 15,000 cusecs discharge for Punjab. Refer to KBD
Project report June 1991. WAPDA fixed wrong dam site at Kalabagh with tailored
design that was kept secret from the then Government of NWFP for its wrong, restricted mid-level silt sluicing
hydraulic design and the left bank canal. WAPDA did not allow building of another
dam in 37 years, when 4 dams could be built in 37 years. This negligence caused
devastation. WAPDA did that with the nation which the terrorists could not do.
Besides the above, Kachi canal planed by
WAPDA failed, SCARPs failed, NDP failed, Kalabagh made controversial by
selecting and fixing dam at wrong site with
wrong design and now the 35 maf, unique
Katzarah Dam is made controversial by frightening the people of the area, the authorities
of Northern areas, and the Government of Pakistan. WAPDA hides merits and
announces demerits.
In case of Katzarah
Dam discovered by me in1960-61 and repeatedly pointed out to WAPDA, WAPDA
only prepared its wrong and exaggerated
environmental aspect with a view to show that it is not feasible
environmentally. WAPDA did not touch the
unique, one in four, technical benefits of 35maf storage that is 6 times of
KBD, controlling flood in the Indus, huge power generation and the unique
benefit of controlling silt from Skardu valley that would increase life span of
all downstream reservoirs. Pakistan has no major reservoirs except
Katzarah, Basha and Guroh Dop. All other reservoirs are either very small or
problematic. There is no dam site on Kabul River, Jehlum River and Chenab
River. Indus is the only river and Katzarah is the only unique dam site on the
Indus that would also work as water shed management dam. Let WAPDA study my
articles on Katzarah Dam, Guroh Dop Dam,
Mirkhani Dam and Fateh barrage sent to all concerned. Please get copies
from IRSA or the Secretary Water and Power. Similarly get copies of the
remaining issues from IRSA or the Ministry.
It is the duty of WAPDA to investigate the technical merits and demerits of each project, specially the
Katzarah Dam, Fateh barrage, Guroh Dop Dam and Mirkhani Dam. It is for the
Government to make decision to build the project or not after judging its
merits and demerits and after obtaining views of foreign consultants. WAPDA has
no authority to reject a project on its own on exaggerated environment issue
and not touching a bit of its multipurpose unique merits. This proves WAPDA’s
psyche of negative tendency and obstinacy. It is surprising that during the
foundation ceremony of Basha, the unique Katzarah was not pointed to the Prime
Minister when he was in that very locality.
The unique Katzarah
Dam.
It is a unique, one
in four project with almost indefinite life span. It creates 35 maf
storage, six times KBD, generates cheap hydropower, controls 100 per cent floods
in the Indus, and controls silt to increase life of all downstream reservoirs.
Basha life will increase from 80 years to 700 years. Tarbala remaining life
will increase by 40 to 45 years. Katzarah
will implement Water Accord by meeting its 22 maf storage requirement. It will replenish 6.5 maf replacement storage
lost. Why WAPDA has shut its eyes to these unique technical merits. Contrary to
this, WAPDA is frightening the local residents and is creating KBD type of
controversy. Please compare the well being of 18 crores population at the cost
of submergence of silt releasing Skardu valley. It’s the Government job to make
decision for building Katzarah and not WAPDA. My report on Katzarah Dam may be examined in details.
Fateh Barrage
Basically this short term project is substitute for the
controversial KBD to bring peace between
the fighting provinces. The KBD project consultants have also indicated to provide unrestricted low-level silt
sluicing hydraulic structure replacing the KBD dictated design. The
consultants meant high barrage. A 260 feet high dam suffers from silting
problem as reported by the KBD consultants. The consultants have also indicated
to reduce its height from 260 feet to 160 feet because of weak foundation. Fateh
barrage will cost $2 billion and completed in 2.5 years. It will function as balancing reservoir for Tarbela reservoir when more
power is needed at Tarbela. WAPDA estimated
power generation of Fateh barrage as 1366 MW. Actually it is much more. It’s
a run-of-river project, will create minimum to maximum power depending on the
river flow. KBD planned to irrigate Laki
Marwat area from the KBD lake through tunnel. Fateh Barrage will also cover
the same area and not Karak as mentioned by WAPDA. Please refer to “Introducing Kalabagh Dam Project” Report June , 1991
issued by WAPDA. WAPDA cheating may be noticed that in 10 days it has
counted the population of the area and the numbers of villages that will be
submerged. All this is jugglery of words to depict projects infeasible. The reservoir is confined to steep hill where
it is not possible for the villages to develop. This is only stated to shelve
the project initiated by me that hurts WAPDA ego—a strong mafia.
Moreover, the storage water will be released during the
period of low supplies. Every now and then freshets come that will be stored. How
can the reservoir be empty from October to May? Is the Indus River dry? Will
this be the situation with KBD? Hydrology of KBD and Fateh barrage is the same.
Storage water will properly be regulated. Investigation will reveal facts.
WAPDA should not form opinion on its whim. I
may inform you that at elevation 880, the gross storage is 4.4 maf and even
then the reservoir will be short of Attock gorge. The gross storage of 4.4 maf created by Fateh barrage is equal to the
joint gross storage of Bunji, Dasu, Munda, Kurram Tangi Dams. Is this not
something unique? We can easily create storage upto 4.4 maf instead of 3.4 maf. We can further go up to Elevation
900 for storing 6 maf or so. In that case the reservoir will reach Attock
Gorge. Investigation will reveal the quantity
of reasonable storage. The barrage involves no silting problem and backwater
flow as KBD. It will cost very low. WAPDA arguments are unreliable. Please get
opinion of foreign consultants. Refer to storage capacity curve prepared by
WAPDA that can help to decide the quantity of reasonable storage.
Akhori Dam
WAPDA tries to prove that Dr Pieter Lieftnic report on
Akhori is wrong. I do not agree with WAPDA. Dr Lieftnick clearly says Gariala
site is preferred to Akhori. For this, he gives reasons. Let the Government
decide if it agrees with Dr Lieftnic or WAPDA. Dr Lieftnic has pointed out many
drawbacks which seem to be serious. WAPDA is habitual in planning wrong projects
such as Kachi Canal, SCARPs, NDP, KBD etc. all that miserably failed and
billions of rupees wasted. Why, no
inquiry was made for these failures? We must know the causes of failure for
accountability and for getting wise.
Please refer to page 266 of Dr Pieter Lieftnic report Vol 1,
revealing that Tarbela height will be raised for diverting water.
“ For any such undertakings, Tarbela would have to be built to elevation 1565 feet in order to
facilitate the transference of water across the divide”
“For 3.3 maf storage it is evident that an inordinate amount
of earth moving would be involved and that serious foundation problems would be
encountered. The Akhori project was deemed less favorable than Gariala. (page
267).
“To convey the Indus water from Tarbela to Gariala; a canal
some five miles long, with a capacity of 76000 cusecs, would be constructed
from the Siran arm of the Tarbela reservoir”
“ See page 292. Akhori is superseded by Gariala”.
The channel to divert
water will remain dry for 9 months and 20 days.
There is no surety that in 20 days the reservoir would be
filled to designed capacity.
In view of above muddy situation, a fair and sound opinion
about these projects can only be given by
hiring known foreign consultants. They may be asked to prepare only the
very preliminary feasibility reports of these four projects. I have found that
my articles/papers on Katzarah and other schemes have not been studied in
details. Therefore the two days discussion was all vague and flying. Correct
conclusion cannot be drawn.
It is pointed out that in IRSA Act, the Chairman WAPDA is
made ex-officio Member IRSA. This naturally means he should be technical man to
actively participate in all such vital technical discussions on projects
costing $ billions. On the completion of term of the present Chairman, the next
Chairman should be an experienced technical person. In my opinion, I consider
Riaz Ahmad Khan Technical Advisor to WAPDA as the most suitable man for the job.
Let Foreign Consultant give advice on these projects. They
should be asked to further improve these. I give only the project concept which
may further be improved. My figures are very rough and needs investigation and
confirmation. All technical details of
projects may be investigated by the consultants.
Storage problem in Indus Waters Treaty
due to silting
How much live storage under definitions is created by
India in 32 hydraulic structures under the Indus Waters Treaty
The Foreign Ministry of Pakistan may request the Government
of India to let us know the aggregate quantity of live storage created in maf on
the 32 hydraulic projects under the technical definition in Appendix-D, that
is, Live storage water under Pondage,
Surcharge storage as floodwater storage, storage created under the run-of-river
including pondage storage and operating pool live storage.
The gross replacement storage of Tarbela and Mangla
Reservoirs built under the Indus Water Treaty, lost about 6.5 maf storage due
to rapid silting. The storage were created to compensate for the loss of
perennial water diverted by India from the canals in Eastern Punjab. The lost
storage needs replenishment otherwise the Treaty would become inefficacious.
India may be request under the Treaty to pay the cost for creating replacement
storage or contribute as before.
The above two basic issues that is, silting of reservoirs and storage created under technical definitions
escaped un-noticed so far, may please be clarified in a spirit of love and
mutual respect. Senator John Kerry report arouses sense of danger.
Senator John Kerry Report to US senate,
India stored enough water to limit the supply of water to Pakistan
Senator John Kerry report to US Senate created alarm. It
appears India has created enough water to harm Pakistan at critical moment in
the growing season. Furthermore, John Kerry has shown fear of water war to
congress. An excerpt from John Kerry report is reproduced.
“India has acquired the ability to store
enough water to limit the supply of water to Pakistan at critical moment in the
growing season”.
The above statement is extremely political with far reaching
consequences. Every word is full of meanings that need political and technical
analysis. The Foreign Ministry and our legal experts may study this statement.
We want to know live storage created under the definition of terms in view of
John Kerry report and the various reports from media showing water war by using
water as weapon of mass destruction by creating famine like situation in
Pakistan..
Engr Fateh ullah khan
Gandapur
Former Chairman IRSA.
Mobile 0300-5920641 June 9, 2012
Copy to;
Secretary Ministry of
Water and Power, Islamabad for information. The situation is brought to his
notice for guidance and decision. Government decision is required to proceed
further. WAPDA head quarter may be shifted to Islamabad to work in close
coordination with IRSA and other professional organizations at Islamabad.
Chairman IRSA Islamabad for expressing Authority views to
the Government. Water regulation and its management and distribution fall under
the jurisdiction of IRSA. These schemes are part of water regulation.
Minister for Water and power for information. He may decide
to appoint foreign consultants to give pre-feasibility reports on at least four
projects. Moreover, WAPDA may be directed not to frighten the people of
Northern area. WAPDA is implanting controversy for Katzarah Dam. WAPDA did the
same for KBD.
Copy to; All Members of the committee for
information and offering written views
No comments: